Fountain House
Belfast
Concrete repairs were carried out to the ornate features on the façade and sacrificial anodes were installed to reduce corrosion of the steel frame. The building was finished with an anti-carbonation coating to preserve the concrete.
| Client | Gilbert-Ash NI Ltd |
|---|---|
| Consulting Engineer | Doran Consulting |
| Value | £156,000 |
| Contract Period | 48 weeks |