Restoration of Clarendon Dry Docks
Belfast
The restoration of the dry docks, dating from 1800, included stabilising the dock entrances, refurbishing dock gates, valves and pump house, repairing and re-pointing the dry dock walls, regrading and resurfacing.
| Client | Belfast Harbour Commissioners |
|---|---|
| Consulting Engineer | Doran Consulting |
| Value | £545,000 |
| Contract Period | 18 weeks |