From the footage, you’ll see that across the site, profile grading is now underway within Central Park as drainage works progress, helping to shape the future green space that will become a focal point for the neighbourhood.
Along River Walk South, historic dock cobbles have been carefully cleaned, reclaimed and reinstated, celebrating the area’s rich maritime heritage while creating an attractive new waterfront route.
Elsewhere, sub-base installation, kerbing and drainage works have been completed to prepare Dock Wall Walk for surfacing, while utility ducting continues to progress as works on Park Street and River Walk near completion.
Construction is also advancing on key infrastructure projects across the site. Concrete works for both the pedestrian bridge and road bridge have made significant progress, with preparations now underway for bridge installation alongside pile cap and wing wall works.
Demolition of the former screening chamber is also continuing, paving the way for future central infrastructure and platform construction.