Project Summary
GRAHAM is currently engaged by NI Water on a comprehensive 6-year programme to upgrade existing assets and increase operational capacity across their network. This collaborative approach demonstrates problem-solving excellence and value for money solutions through a dedicated GRAHAM team, extensive supply chain, and client operations staff collaboration, ensuring reliable infrastructure improvements throughout Northern Ireland.
Project Detail
To provide more reliable and efficient wastewater pumping stations for multiple local areas comprising both residential and commercial catchments across Northern Ireland, whilst maintaining existing operations and maximising operational and capital cost efficiencies.
We employed a range of delivery strategies to ensure minimal disruption to operations and communities. Typical works included replacement of pumps, upgrading and replacement of pipework and Motor Control Centre (MCC) panels, and refitting all building services.
What they had to say
Maintaining our pumping stations and ensuring they can work as efficiently and effectively as possible is critical to keeping our wastewater network flowing and protecting the environment.”
Tzvetelina Bogoina, Director of Infrastructure Delivery NI Water