Project Overview

Client Network Rail

Project Value £10.3million

Key Contact Jonathan Kerr: Rail Director

Expertise Civil Engineering

Sector Rail

Timeline January 2014 to December 2015

Location England - South and Midlands

Tennison Road Bridge, London

Ten track rail bridge hits the right note for Croydon commuters

Project Summary

Significant in both scale and complexity, the multi-award winning Tennison Road Bridge, with a design life of 120 years, has signalled a shift towards modernity for Croydon commuters. Exemplifying our deep expertise in tackling intricate engineering challenges, this £10.3m project replaced the existing 90-year-old road over rail bridge with an innovative structure that is approximately 3.5 metres wider than its predecessor, encompassing broader footpaths on both sides of the bridge over the railway lines.

55m

span half through steel bridge

4.5m

steel girders

3.5m wider

than the existing structure

Project Solution

Recognising our team’s technical excellence, the new bridge structure, which was installed by ‘launch and slide’ techniques over 10 rail lines, and completed in August 2015, was the winner of the prestigious ‘Evening Standard People’s Choice Award’ at the ICE Awards.

This industry acknowledgement, just one of many, was testament to the innovative and collaborative approach, which defined the project. Epitomising this ingenuity, the road bridge, weighing 515 tonnes exclusive of a 50 tonne nose cone, was the first ‘live launch’ in the UK that was delivered without any practice under possession prior to continuing as a ‘live launch’.

Seamless possession handbacks were also a feature of our client focussed delivery, with the temporary bridge hand back of 41-hour possession - eight hours ahead of schedule - just one obvious example. Zero reportable accidents over 231,000 ‘man-hours’ and a vibrant engagement programme established with the local community represent additional facets of our Croydon completion.

"I’m delighted that the council has played a part in delivering this impressive first in rail engineering. This new and wider bridge will last for decades and make a real difference to everyone who uses Tennison Road"

Councillor Kathy Bee Cabinet Member for Transport and Environment at Croydon Council

"The old bridge had served the local community for over ninety years, but it had become outdated and needed replacing. The new bridge will better serve those who use Tennison Road, providing safer access for motorists, cyclists and pedestrians"

Mark Huband Route Asset Manager for Network Rail